Project Name: Tenant-fit-up of New Cosmetology School 40th & Chestnut St. Philadelphia., Pa.
Client: Jean Madeline/Aveda Institute 3943 Chestnut St. Philadelphia, Pa. 19104
Firm’s Responsibilities
• Design fit-up of mechanical-HVAC duct and heat pumps for two-level educational facility, part of a nine story office building. Outside air, supply/return, and exhaust ventilation.
• Plumbing system to include design of hair-wash stations; ejector pump; dryer/washer facility; and ADA restrooms.
• Electrical: lighting, power supply to beauty stations; fire alarm system; IT-room and CCTV.
Project Description:
• Size: 18,000 SQ. Ft.
• Construction Cost: $1.8 million (Mechanical, Electrical, Plumbing)
• Construction Completion Date: March 2007