Project Name: New process boilers and chillers for buildings #110 and #114

Client: KVK Tech, 110 Terry Dr, Newtown, PA 18940

Firm's Responsibilities:
• Design to include installation of 110 h.p. hot water boilers; installation of 110 h.p. hot water boilers and 250 ton water chillers for buildings #110 and #114.
• Boiler house to include circulation pumps; expansion tanks; high pressure gas train; combustion air,and boiler safety controls.
• Chilled water system with circulation pumps; expansion tanks; chemical feeder; glycol feed water system; expansion joints; and pipe hangers design.
• Electrical power supply to boilers and chillers.

Project Description:
• Construction Completion Date: December 2017

New process boilers and chillers for buildings #110 and #114